RERA-Approved · InterNACHI® Certified · Since 2010

Renovation & Fit-Out Snagging — Because Contractors Grade Their Own Homework

You paid for a specification. The contractor delivered "finished." An independent fit-out inspection measures the distance between the two — while your final payment still gives you the power to close it.

6 HrsReport Delivery
95,000+Inspections Completed
Homes +Offices & Retail
100%Independent
Renovations & Fit-Outs

The Most Expensive Renovation Defects Are the Ones Behind the New Finishes

Renovation work hides its own evidence: new tiles cover the screed quality, new gypsum covers the wiring, new paint covers the plaster. Instrument-led inspection is the only way to grade what's underneath.

Dubai's renovation market ranges from excellent firms to crews learning on your property. The defects we find most: bathroom renovations with compromised waterproofing (the single costliest failure), electrical additions without proper earthing, AC modifications that wreck airflow balance, and tiling over unprepared screeds that debonds within a year.

Our fit-out inspections verify workmanship against your scope and quotation — testing new circuits, running new plumbing under pressure, thermal-scanning renovated wet areas, and checking finish quality at the junctions and edges where rushed work always shows first.

For older villas being renovated before resale, this pairs with our renovation-for-resale inspection guidance: verified renovation quality is a sales asset, while hidden renovation defects become the next owner's lawsuit.

Why It Matters

What Independent Fit-Out Inspection Protects

🛁

Wet-Area Waterproofing

Renovated bathrooms are Dubai's #1 fit-out failure. We thermal-scan and test before the tiling hides the truth forever.

Electrical Additions

New circuits, spots, and sockets tested for earthing, loading, and RCD protection — renovation wiring is where safety corners get cut.

📐

Finish-Quality Grading

Junctions, edges, alignment, and detailing measured against the standard you paid for, not the one delivered.

💰

Final-Payment Leverage

An itemised defect register presented before the last payment turns rectification from a favour into an obligation.

🏢

Business-Ready Fit-Outs

Office and retail scopes verified before opening day — because post-opening rectification means closing again.

📄

Scope-Mapped Reporting

Findings tied to your quotation line items, so the conversation with the contractor is short.

Inspection Scope

Renovation & Fit-Out Inspection Scope

Focused on the works performed — verified against your scope, quotation, and applicable standards.

Wet Works & Structure

  • Waterproofing integrity (thermal)
  • New tiling — bonding & levels
  • Screeds, plaster & gypsum quality
  • Modified walls & openings
  • Sealant & junction detailing
  • Drainage modifications under flow

MEP Modifications

  • New/extended circuits & earthing
  • DB modifications & protection
  • AC alterations & airflow balance
  • New plumbing under pressure
  • Water heater installations
  • Lighting & smart additions

Finishes & Joinery

  • Paint systems & surface prep
  • Custom joinery & cabinetry
  • Doors, hardware & alignment
  • Flooring installation quality
  • Feature walls & cladding
  • Scope-vs-delivered comparison
How It Works

From "It's Done" to "It's Right" in 4 Steps

Share Scope & Quotation

We inspect against what you contracted — send the scope, BOQ, or quotation with your booking.

Works Inspection

Engineers verify each renovated element with instruments, focusing on concealed and safety-critical works.

Defect Register in 6 Hours

An itemised, scope-mapped rectification list with photo evidence — before your final payment.

Rectification Re-Check

Optional re-visit confirms the contractor's fixes before you close the account.

Your Report

The Report That Ends "Trust Me, It's Fine"

Every finding is photographed, located, severity-rated, and mapped to your scope — so the rectification discussion is about a checklist, not about whose opinion counts.

See the sample reports below for the evidence standard your contractor will be answering to.

Every Report Includes

  • Photo & video evidence for every defect
  • Exact location tagging, room by room
  • Civil, MEP & finishing sections
  • Severity rating — critical issues first
  • Delivered digitally within 6 hours
FAQ

Renovation Snagging Questions, Answered

What is renovation or fit-out snagging?

An independent inspection of completed renovation or fit-out works — verifying workmanship, safety, and finish quality against your agreed scope before you make final payment to the contractor.

When should I book it?

At practical completion of the works, before the final payment or handback. That's when documented defects are still the contractor's contractual problem.

Why are renovated bathrooms such a risk?

Because waterproofing is invisible once tiled. A compromised membrane shows up months later as leaks into the room below — the costliest and most common renovation failure we document.

Do you inspect office and retail fit-outs?

Yes — commercial fit-outs are verified before opening, covering finishes, MEP modifications, and scope compliance, so rectification doesn't collide with your trading hours.

Can you check a renovation done before I bought the property?

Yes — that's a pre-purchase inspection with renovation focus: we assess what the seller's renovation actually concealed. Highly recommended for recently 'flipped' units.

What if the contractor disputes the findings?

Findings are instrument-based and photo-evidenced, mapped to your scope. Disputes tend to end quickly when the evidence is on the table — and the final payment isn't yet.

Verify the Work While You Still Hold the Money

Send your renovation scope and completion date — we'll grade the work before the contractor closes the file.

Request Your Quotation